Withings Inc WBS08-BLACK-ALL-INTER - Withings Body Scan Wifi Smart Scale, Black - 1/Each
Order notes
- Restrictions may apply to this product - we will confirm your order by phone or email before processing
The Withings Body Scan is a black, battery-operated step-on smart scale with an LCD display and a 440 lb. / 200 kg weight capacity. It measures segmental body composition and syncs by Wi-Fi or Bluetooth.
This product can be found in our Diagnostics -> Diagnostic Instruments and Supplies -> Scales and Body Composition Analyzers -> Body Composition Analyzers section.
- SKU
- 100-1239777EA
- Color
- Black
Description / Withings Inc WBS08-BLACK-ALL-INTER - Withings Body Scan Wifi Smart Scale, Black - 1/Each
The Withings Body Scan is a Wi-Fi smart scale that you step on to weigh in and measure segmental body composition. It has a color screen and can recognize up to 8 users, so everyone in your home can track their own data.
- Can record a 6-lead electrocardiogram (ECG) at each weigh-in, a test often done in a hospital that shows the electrical activity of your heart
- Regular ECG recordings give you more chances to record signs of atrial fibrillation (AFib), a common form of arrhythmia
- Connects by Wi-Fi or Bluetooth and syncs your data automatically to the Withings app
- Clear, bright color screen shows your measurements at a glance
- Recognizes up to 8 different users, so each person in your home can monitor their own health data
- Application: segmental body composition
- Step-on style scale with LCD display
- Weight capacity: 440 lbs. / 200 kg
- Platform dimensions: 1 X 12-4/5 X 12-4/5 inch
- Battery operated
- Color: black
- Sold as 1 each
Check that the 440 lbs. / 200 kg weight capacity and the platform dimensions of 1 X 12-4/5 X 12-4/5 inch suit your needs before ordering.
More Information
| Unit Of Measure | Each |
|---|---|
| Manufacturer Item Number | WBS08-BLACK-ALL-INTER |
| Country Of Origin | Unknown |
| Measurements | Fat, Muscle, Bone |
| Method of Measurement | Electrodermal Activity Score |
| Buy American Act (BAA) Compliant | No |
| Trade Agreement Act (TAA) Compliant | No |
| UNSPSC Code | 42182805 |
| Manufacturer Name | Withings Inc |
| Manufacturer Number | WBS08-BLACK-ALL-INTER |
| Application | Segmental Body Composition |
| Brand Or Series | Withings |
| Qty Per Unit of Measure | 1 |
| GTIN | 13700546707954 |
| Platform Dimensions | 1 X 12-4/5 X 12-4/5 Inch |
| fsa_eligible | Yes |
| Weight Capacity | 440 lbs. / 200 kg |
| Color | Black |
| Display Type | LCD Display |
| Power Source | Battery Operated |
| Type | Step On |
More in This Series
| Product | Color |
|---|---|
| Withings Inc WBS08-BLACK-ALL-INTER - Withings Body Scan Wifi Smart Scale, Black - 1/Each (this item) | Black |
| Withings Inc WBS08-WHITE-ALL-INTER - Withings Body Scan Wifi Smart Scale, White - 1/Each | White |
FAQ
What is included in Diagnostic and Medical Supplies?
How do I find a specific product in this category?
Can facilities order in bulk or get a quote?
Shop medical supplies by category
- Respiratory & CPAP: CPAP masks and parts, oxygen masks and cannulas, nebulizers, and airway supplies.
- Urological: Foley and urethral catheters, intermittent catheters, and extension tubes.
- Needles & Syringes: syringes, hypodermic needles, insulin syringes, and sharps containers.
- IV Therapy: IV catheters, extension sets, infusion sets, and IV dressings.
- Instruments: surgical and exam instruments, scissors, speculums, and instrument detergents.
- Diagnostic Equipment: ultrasound accessories, probes, recording chart paper, and sterilization supplies.
- Masks, Gowns & Scrubs and Gloves: protective apparel and exam and surgical gloves.
- Clinical Laboratory: blood collection tubes, centrifuge tubes, and reagents.
- Drainage & Suction: suction tubing and catheters, drainage kits, and mucus traps.
- Test Kits & Trays: specimen containers, swabs, blood transfer devices, and shipping containers.
- Diabetes Supplies: glucose test strips, meters, and lancets.
- Blood Pressure: blood pressure monitors and cuffs.
- Textiles and Indicators & Signage: towels, drapes, and covers, and sterilization and biohazard labels.
Before you order
Product pages list sizes, materials, sterile or non-sterile status, and how each item is sold (each, box, or case). Facilities can order in case quantities and can ask our customer care team about a business account.